Getting a Quote

Quote to Order Process

1. Define the Stair Layout

E-Mail Us

E-Mail Us

To request a quote from a print, e-mail us your full set of plans.

Dimensioned Drawing

Dimensioned Drawing

If you don't have plans, we can quote from a dimensioned drawing.

Remodel

Remodel

Send photos of the stair area to be remodeled. Include as many photos as necessary to show the entire stair area including the starting tread, and any horizontal rail all the way to the wall. We only need close-up photos if you want reproduction styles quoted.

2. Define the Stair Styles and Materials

Select Styles to Quote

Go to selections to look at what styles you would like your quote in.

Browse Stair Styles

Use Standard Styles to Quote

Use our most popular styles for your quote.

Request a Quote

Stair Design / Layout

Design / Selections

Design / Selections

We offer full design/support services for selections, whether you want to come to our showroom in Sandwich, Illinois, or have a remote meeting via our website. We are happy to start from your concept or inspiration images and review both stock or custom-designed styles to align with your budget and design goals.

Stair Layout

Stair Layout

After getting the field dimensions, layout can begin. Every principle of design is considered within the framework of your specific application. Our vast experience in stair design allows us to visualize each and every joint, intersection, miter, and connection to make sure that your design results in the ultimate combination of strength and beauty.

Order Stairs / Schedule

Order

Order

At this point you should have carefully read your quote/contract. If anything is unclear to you, please call and let's review those items. Sign the quote and return it to us. Deposits (50%) can be made by sending a check (allow 10 days) or, for faster processing, either use Quick Pay (secure payment form) or email us an image of your check.

Schedule

Schedule

Proper timing of the installation of your stair is key to a successful outcome. Schedule your installation for after your drywall has been primed — the drywall process can damage an unfinished hardwood staircase (drywall mud and paint overspray). Also schedule before your flooring goes in; we'll install the stair after the flooring job is complete. Remember, while we're installing a stair no one can get up or down that floor level, so it's best to schedule us when no access to the stair area is needed. Due to our shop fabrication of kits, our time on site is a fraction of other stair companies who deliver un-fabricated parts. Our backlog is typically 3 to 6 weeks (sometimes longer), so order in plenty of time to get the install date you want.